All,
I have cacti (newest version 1.2.13) on RedHat 8 and i need to move all the graphs, I mean entire migration of RRD files and database from old cacti which is running redhat 6 and cact 0.88b. I followed the steps as mentioned in the links https://forums.cacti.net/about22665.html <https://forums.cacti.net/about22665.html&highlight=> &highlight=, the problem is the copied graphs which are almost 1000 devices still do not appear in the interface.. do you think is I am missing something? Or this is normal behavior as it is takes some time to update the copied one graphs let say a day or two? Thanks, Mohammed Ejaz Asst. Operation Director of Systems. Cyberia SAUDI ARABIA P.O.Box: 301079, Riyadh 11372 Phone: (+966) 11 464 7114 Ext. 140 Mobile: (+966) 562311787 Fax: (+966) 11 465 4735 Website: http://www.cyberia.net.sa _______________________________________________ cacti-user mailing list cacti-user@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/cacti-user