We also need to add information on the howto_migration.xml page to help person upgrading from 1.4.1 to 1.5. Is that the same thing as the
I'd say that can wait until after the beta release.
release notes?
Not really, although there's a cross-cut :-P
-chris
-----Original Message----- From: Vincent Massol [mailto:[EMAIL PROTECTED] Sent: 13 July 2003 23:43 To: 'Cactus Developers List' Subject: RE: Last remaining tasks before releasing Cactus 1.5
-----Original Message----- From: Christopher Lenz [mailto:[EMAIL PROTECTED] Sent: 13 July 2003 23:09 To: Cactus Developers List Subject: Re: Last remaining tasks before releasing Cactus 1.5
Vincent Massol wrote:
Hi,
Here are the items that remain before we can cut the release:
- Fix bugzilla bugs or mark them as won't fix or later - Fix pb with Orion 1.6.0 and Orion 2.0 not passing the sample
servlet
test
Seems to be a problem with JDK >= 1.4. All tests pass fine under JDK 1.3.1. No idea about the details, so I'll just add a note to the
"Tested
On" page. We shouldn't consider this a show-stopper for releasing
1.5
beta 1 IMO.
- Exclude the Clover reports from the distribution as it weights
too
much (several MBs)
done
- Wait for Gump to run successfully at least once as we've made
several
changes today - Try using the distributables (both 1.2 and 1.3) to ensure they
work
- (optional) Fix the how it works section to include begin() and
end()
doc - (optional) Learn about apache mirroring
This should be mandatory IMHO.
- (optional) Learn about apache release signing
Any more?
Thanks -Vincent
-- Christopher Lenz /=/ cmlenz at gmx.de
--------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]
