Hi Glenn, Thanks for the write up, I have a question/comment about "Stage 5" in the text write up.
> Stage 5: (GUEST) > > DC (running inside the Guest) configures a root pool using the Guest's > virtual disk (which it will need to figure out what the disk is called). It > then proceeds to populate and configure that root pool based on the installation > manifest which was included during construction of the PVMC ISO. The process in > some ways will be similar to how the slim_cd is constructed (minus the iso and > usb creation steps). Packages will be downloaded from a repository (specified > in the manifest) to the root pool. Additional configuration to make the root > pool bootable as well as turning it into a proper installation will also be > performed. You mentioned that the process in similar to the slim_cd construction steps minus the iso and usb creation steps. I think that it would be best to just use the current im-pop step to install the packages, and then, reboot the Guest to let the rest of the configuration happen naturally. --Karen > > When installation/configuration of the appliance is completed, DC will shutdown > the guest (init 5). Glenn Lagasse wrote: > Hi All, > > As promised here is a diagram of the overall VM construction process > that I outlined in my design notes. I apologize for it's > text centered-ness, but after having OO Draw core on me a few times I > gave up with the fancy and went with the functional. > > I'd be more than happy to discuss this at our tuesday meeting, over the > phone, email, whatever works for people. If there's something(s) that > aren't clear, please don't hesitate to bring them up and I'll do my best > to clarify. Hopefully this helps in understanding my design. > > Thanks! > > > ------------------------------------------------------------------------ > > _______________________________________________ > caiman-discuss mailing list > caiman-discuss at opensolaris.org > http://mail.opensolaris.org/mailman/listinfo/caiman-discuss