try with mktime()

mktime(5/6/2009) - mktime(3/6/2009)

maybe :P

On Thu, Jun 18, 2009 at 9:26 PM, keanoppy<[email protected]> wrote:
>
> let say this database of mine got 2 columns, 1 is planned date,another
> is actual date.
> at the first row, the planned date is 3/6/2009 and actual is 4/6/2009
> at the second row, they are 5/6/2009 and 10/6/2009 respectively
> how can i create a view to determine the duration between the two
> dates between rows respectively?
> as in planned duration:5/6/2009 - 3/6/2009 and actual duration is
> 10/6/2009 - 4/6/2009
>
> >
>



-- 
Stefano Salvatori M.
http://stefano.salvatori.cl/

--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"CakePHP" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at 
http://groups.google.com/group/cake-php?hl=en
-~----------~----~----~----~------~----~------~--~---