"Neil Arlidge" <[EMAIL PROTECTED]> wrote: >Adrian Stott wrote:
>> They *will* have to move, because a weir with sluice gates has to be >> built across the Three Mills Wall river (which is what they are in) to >> hold up the level of the Waterworks River. AIUI, the plan is to >> reorganise the moorings above that new sluice. >> >> Adrian > >Shirley there is plenty of room for a sluice beyond the final bridge in >Three Mills Wall River? AIUI engineering considerations require it to be built slightly further upstream. Adrian Adrian Stott 07956-299966
