Date -  25/03/08
Day -  Tuesday
Start - 0900 
End -  1730 Atherstone

We the chap in the cruiser still had his outboard running when we went to
bed last night so I am glad we moved along a bit. We set off this
morning a 9 am in bright sun with no wind. Our first stop was The Ashby
Boat Company for a pump out, we then continued to the junction of the
Ashby and the Coventry canal, by now a cold breeze had picked up, but
nothing like earlier in the trip. We turned right on the Coventry and on
to Nuneaton where our boating friends Hazel and Peter happened to be
looking out of there house window as we were passing, we had slowed
incase they were in. Peter has built a jetty along the bottom of their
garden, so we made fast and went in for a cupa and swap plans and past
trips. We left them about half three and headed on to Atherstone. BW
have done grand work along this stretch cutting down overhanging trees
on both sides of the cut. We moored for the night just above the locks
at about 5-30 pm.
For those of you that have boated between Nuneaton and Atherstone may
recall a basin pulled out on the left hand side with a narrowboat on it
and not connected to the canal, the narrowboat has now been removed but
there is still a piece of bank between the basin and the canal.
 
-- 
Brian <[EMAIL PROTECTED]>

Visit this site and help save our waterways
 http://www.savethewaterways.org.uk/

Reply via email to