Brian Dominic <[EMAIL PROTECTED]> wrote: >Having filled up the water tank we joined the queue for the two pairs >of staircase locks down to the river. Because of the number of boats >it took up well over a hour to get onto the river
Wouldn't BW let the barge locks be used to clear the queue? > Having rung in advance, Gloucester Lock was ready to > lift us up into the docks I bet that isn't what you meant to say. Adrian . Adrian Stott 07956-299966
