Date - 26 Feb 09
Day - Thursday
Start - 0940 Branston
End - 1645 Alrewas

We set off this morning at twenty to ten, one boat had gone by earlier but we 
found to our surprise the next lock empty. We made a brief stop at the cafe 
where the boaters rubbish bins are now located before continuing to Barton 
Turns. We pulled over to take water on the lock moorings when a young lady from 
BW walked down and said there was a problem with the lock and there would be a 
short delay, we continued to fill the water tank and then Diana walked up to 
find the stop planks in. At 11 am a BW chap walked down to tell us they were 
waiting for a crane to arrive so they could lift and reseat the lock gate as it 
had come out of the cup. The crane should be here by 1 pm and we should be on 
our way by 4 pm all being well. 1 o'clock came as did a bunch of BW operatives, 
but no crane, 2 o'clock and still no crane but lots of telephone calls, 15 
minutes later and the crane lorry arrived, by 3 o'clock the gate was out, the 
steel toe fitted back into the bottom of the gate, new rubber seals fitted to 
both sides of the gate and the gate was back in the lock swinging freely in the 
cup at the bottom and in the band at the top. The stop planks lifted and the 
lock cycled a couple of times to prove all was well. If the crane had arrived 
on time we would have been on our way by two. One boat waiting above came down 
and by 3.30 we had gone up and were leaving the lock. We pushed on up to 
Alrewas where we moored for the night at about quarter to five.




You will find our latest position at
http://tinyurl.com/Harnser-s-route

-- 
Brian <[email protected]>

Visit my Web site at http://www.harnser.info