On 10/22/2013 06:01 PM, Evan Dandrea wrote:
On 22 October 2013 15:51, Andy Doan <[email protected]> wrote:
for the staging instance where we have the new "test execution service" job.
I was thinking about some metrics like:
ubuntu-ci.staging.touch-execution-service.total_tests (counter)
ubuntu-ci.staging.touch-execution-service.autopilot_tests (counter)
ubuntu-ci.staging.touch-execution-service.job_duration (timer)
ubuntu-ci.staging.touch-execution-service.provision_duration (timer)
I wouldn't fret too much about the hierarchy. I'd just pick something
and run with it. In this case, I'd probably flip staging and
touch-execution-service around such that you could have
ubuntu-ci.touch-execution-service.{staging,production}.*
Those look like good metrics. Please wire them up :)
Hey Guys,
I've got one set of metrics in graphite now that help show how long the
new "test-execution-service" aka "mega" jobs take. I'm new to this, but
I believe I've built a report. The URL is insane, so I've used a shortener:
http://tinyurl.com/ubuntu-ci-mega-times
I wanted to scale these times from ms to minutes, but the resulting
graph I was generating didn't look right. So for now I look at the
numbers and divide by 60,000 so that they are easier for me to
intuitively understand.
--
Mailing list: https://launchpad.net/~canonical-ci-engineering
Post to : [email protected]
Unsubscribe : https://launchpad.net/~canonical-ci-engineering
More help : https://help.launchpad.net/ListHelp