The following hosts in the CI Lab at the 1SS data center are scheduled to be down at the following times for physical maintenance:
qa-radeon-7750: 1/6/2014 @ noon EST to 1/7/2014 @ noon EST (time is flexible) qa-nvidia-gtx660: 1/7/2014 @ noon EST to 1/8/2014 @ noon EST (time is flexible) ps-nvidia-gtx650i (thinclient-slave): 1/8/2014 @ noon EST to 1/9/2014 @ noon EST (time is flexible) ps-radeon-hd6870-he: 1/9/2014 @ noon EST to 1/10/2014 @ noon EST (time is flexible) The down time is marked as flexible, meaning the time could be shorter or longer depending on if any additional parts are actually needed that I don't already have on hand. Please let me know if anyone has any concerns. Thanks! Rick