Hi,
In GS, we have 1 L1 issue and 30 L2 issues. Most of the L2 issues were
created after the gadget-repo code/design review conducted yesterday and
most probably would be fixed by the deadline.
In Mashup, there are 1 L1 issue and 13 L2 issues in which most of them are
quite old. Lalaji is in the process on verifying the issues as according to
Ruchira these must be fixed with the latest release. She is also testing the
samples.
The jira filters are as follows:
GS:
https://wso2.org/jira/secure/IssueNavigator.jspa?mode=hide&requestId=10484
Mashup:
https://wso2.org/jira/secure/IssueNavigator.jspa?mode=hide&requestId=10499
--
Regards,
Dinithi Nallaperuma
On Tue, Apr 26, 2011 at 10:27 PM, Pradeep Fernando <[email protected]> wrote:
> Hi,
>
> In carbon-core right now we have,
>
> L1 -> 3
> L2 -> 17
>
> think we can meet the deadline.
>
> --Pradeep
> _______________________________________________
> Carbon-dev mailing list
> [email protected]
> http://mail.wso2.org/cgi-bin/mailman/listinfo/carbon-dev
>
_______________________________________________
Carbon-dev mailing list
[email protected]
http://mail.wso2.org/cgi-bin/mailman/listinfo/carbon-dev