Hey,
having gone throuh the pain of releasing Core and Windsor today I wanted
to say one thing - it's extremely painful to go thought. All the (many)
steps are manual and require a lot of time to complete. It took me half
of the day to get it all working and out the door. That's not how it
should be. I chatted with Roelof and he proposed that we should look
into automating as much of the process as possible. I couldn't agree more.
We should also change how we assing build numbers. Currently we use
autoincremented builds count from TeamCity which has the drawback that
if we release several version of the same project (for .NET 3.5, 4.0,
4.0 CP, two versions of SIlverlight, possibly Mono in the future) all of
them have different numbers. For the release I manually set up the
counter to be the same for all builds but we should have it done
automatically.
This is a major issue and to keep shipping the software on a sustainable
pace we need to streamline and automate it a lot.
Comments and ideas welcome.
Krzysztof
--
You received this message because you are subscribed to the Google Groups "Castle
Project Development List" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to
[email protected].
For more options, visit this group at
http://groups.google.com/group/castle-project-devel?hl=en.