Apologies if this has come up before, but I did search my blog archive  
and use the search facility on blog.ipexpert.com...

For these to tasks, the DSG took a different route than I did, and I  
would like to check mine is valid. The DSG talks about building one  
bridge group to R5 for task 7.3, and then one to R6 for 7.4 by  
splitting the frame relay into sub interfaces.

I however did not change the frame relay, and just built a single  
bridge group to R6. I mved to frame relay ip's to the bvi interfaces  
and added secondarys for the 150.100.221 interfaces. This worked fine  
when mapped with frame map commands.

For task 7.4, I created a chain of bridge groups starting at r1, r2,  
r6, r9 (r2 and r6 already configured from previous task, I just added  
in the extra serial int on r6).

This seems to work okay, and meet the objectives... I did have  
intermitent connectivity, but I think that is caused by running 11  
routers pretty much all bridging in GNS3.. Can't be sure though.

This meant I didn't need to change ip subnets for the frame relay  
ip's, didn't need to. Change the interface types, and didn't need the  
second bridge group.

I am sure I am missing something....but I can't see what?


Sent from my iPhone
_______________________________________________
For more information regarding industry leading CCIE Lab training, please visit 
www.ipexpert.com

Reply via email to