Hi Guys

Ok, Thanks to Bob for sending me the text file, however this does not seem to do all that I need.

What started me thinking about this was that so far I have been working through the labs from book 1 by building my own config in GNS3. Apart from the first few, where the switches are a vital part of the lab, this works pretty well, with a bit of care over the inevitable different interface designations. However I have come to lab 13, where the CAT switches need to take part in the BGP peering. So what I have been trying to do is make the IPexpert GNS3 config work to do this. First thing I found that I needed that I did not have was a cross reference between the interfaces used on the actual Cat switches and the interfaces that replace them in the GNS3 config, so I now have a spreadsheet that does that. Next I need to get them configured to do as much as possible, eg set up the appropriate trunking. At the moment I am getting kind of bogged down in that..does anyone have any configs for that, eg the equivalent of the initial configs as provided in the workbooks, only for the GNS topology instead of the Cat switches. Or is this not actually feasable? Which labs is the GNS3 topology really useful for and which ones would I be better to do using rack time? I do have lab time available on the Proctor labs, but find an eight hour stretch a bit hard to schedule.

regards
John

On 1/08/2012 12:35 p.m., Bob McCouch wrote:
bob@lab:~/scripts$ cat ipx-config-fixups.txt
#######################################################
#####      THIS IS NOT AN EXECUTABLE SCRIPT       #####
#######################################################



_______________________________________________
For more information regarding industry leading CCIE Lab training, please visit 
www.ipexpert.com

Are you a CCNP or CCIE and looking for a job? Check out 
www.PlatinumPlacement.com

http://onlinestudylist.com/mailman/listinfo/ccie_rs

Reply via email to