Hi Shai,

We are aware of this mistake in lab 1.
As a workaround please use a frame-relay PVC instead. Don't do anything fancy with bridging, just take the Frane-Relay PVC from R2 to R5.

We will make sure to fix it with the next update round.F


--

Regards,

Rick Mur
CCIE2 #21946 (R&S / Service Provider)
Sr. Support Engineer – IPexpert, Inc.
URL: http://www.IPexpert.com

On 30 okt 2009, at 07:22, Shai Loufton wrote:

Hello all,
This has been discussed before – but even though I have looked at all my emails regarding this I could not get this to work. To make a long story short – the base connectivity of the 7200/ATM rack shows R2 connected to R4 connected to R5 , while the SP Volume II lab 1 uses a R2-R5 link which isn't there. It was recommended before to use frame-relay bridging on R4 to simulate that link in order to make the base connectivity work – but I could not. I also tried PPP as someone mentioned in a previous thread – couldn't make that work either. I reverted the POD and moved to lab 2 on VOL II – and plan to retake this lab tomorrow.

If anyone been through this and has a working config of R2-R4-R5 that simulates a direct link between R2 and R5 – please share it..

IPexpert team – I think someone from your side should at least think about publishing a workaround for this as this breaks the L2 connectivity of the lab and thus can lead to many many hours of frustration …..


Shai L
_______________________________________________
For more information regarding industry leading CCIE Lab training, please visit www.ipexpert.com

_______________________________________________
For more information regarding industry leading CCIE Lab training, please visit 
www.ipexpert.com

Reply via email to