Thanx for the repsonse Ruben.

Good luck with that merge, I hope you don't get too many headaches! I
know from plenty of experience how these things go in reality ;-)

Shaun



On 9 Feb, 11:37, Ruben Willems <[email protected]> wrote:
> Hi
>
> the setup sounds ok,
> concerning the poll mechanism, Craig it busy with events and so, and this
> could/should replace the polling mechanism.
> It will not be in the 1.4.3 release, but maybe in the one after it.
>
> I'm still merging the security code in the trunc, and this has taken more
> time than I had foreseen :-(
>
> with kind regards
> Ruben Willems
>
> On Mon, Feb 9, 2009 at 12:28 PM, CinnamonDonkey <
>
> [email protected]> wrote:
>
> > Hi,
>
> > Based on my fancy ASCII diagram here:
>
> >                    MASTER CCNET
> >                        MACHINE
> >                              +
> >         +-------------------+-------------------+
> >          |                                         |
> >   CCNET                                 CCNET
> > MACHINE A                          MACHINE B
>
> > Is it OK to have two (or more) machines run Project Triggers and both
> > trigger simultaneously of one master machine/project?
>
> > The idea is that the master machine does a QUICK build on the project
> > and machines A and B both run tasks which take a long time, but can be
> > done in parallel.
>
> > On a side note, why does the project trigger POLL, would it not be
> > better to have the dependant project be signaled a status of
> > interest?
>
> > i.e. in the dependant projects config:
>
> > <signalTrigger>
> >   <triggerOn Signal server="//ccnetmachine"
> > project="incrementalBuild" status="Failed" />
> > </signalTrigger>
>
> > This would save on all that polling and on the possibility that the
> > time between polling might miss an event of interest.
>
> > Regards,
> > Shaun