Brad, I think you're right. :) thanks SO MUCH.
Im a newbie at this, and I
was afraid I was overthinking it. Digging into the msbuild
logger.....perl
triggers....etc.....
I can just run the accurev CLI as my last task in the task section. If
the
continuous integration build succeeds, itll run...if it doesnt it
wont.
Thanks,
Russ

On Feb 11, 10:29 am, Brad Stiles <[email protected]> wrote:
> > When ccnet.config runs msbuild, on a continuous integration stream
> > (building everytime there is a checkin), and succeeds, is there a way
> > to capture that value, so I can issue the command to [promote all] to
> > the parent stream?
>
> Wouldn't that just be a second (or third, or whatever) task in the
> <tasks /> section?  As I recall, execution of the build stops and all
> subsequent tasks are skipped when one of the fails.
>
> /bs