Scenario:
* A build is scheduled to be run at 10:00am (IfMoficationExists).
* A build has been forced at 9:50am.
* Forced build is completed at 11:00am.
* There are modifications checked in between 9:50am and 11:00am
* Scheduled build (10:00am) gets kicked off.

In the above scenario, I want to skip the "catching up" of delayed
10am build once there was a build completed at the same time. Is there
a way to skip it?

Reply via email to