Is it possible to setup a Triggers block with Conditional-based timers? For instance, for the same Project block, I would like to fire off a Daily build that runs once a day and only once a day; Scheduled Trigger, if you will. Then turn around and specify a Developer build in the same Project block, but have it run at intervals, call it Interval Trigger, if you will. Is something like this possible? The only other recourse we seem to have is to repeat the same Project code block the only difference between the two (for the most part) is the Trigger block.
Thank you... Regards, Michael
