There is a setting for that ..

Just look into the documentation..

Regards



Am 29.02.2012 um 17:34 schrieb Chris <[email protected]>:

> Say I have continuous integration every 5 mins. Say I have 10 files to
> check in. After I check in my first file, and 5 seconds later, my
> continuous integration just happen to trigger at the 5-min boundary,
> before I check in my other 9 files. How can I set it up so I delay the
> build for a specified amount of time after the first detection of an
> out-of-date or missing file to give me time to checkin my other files?
> Make sense?
> 
> -chris

Reply via email to