***  For details on how to be removed from this list visit the  ***
***          CCP4 home page http://www.ccp4.ac.uk         ***


On Thu, 2005-10-20 at 14:46 +0800, Jiamu Du wrote:
> I have collected two sets of data from two crystals. The data is
> scaled by HKL2000 and is turned from sca file to mtz file by
> Scalepack2mtz in CCP4. Both the two sets of the data have the same
> spacegroup and cell parameters. And I have gain the same molecular
> replacement result model from each single set of data. But the
> completeness of each set of data is less than 90%. Now I want merge
> the two sets of data together to improve the completeness. I have
> tried Scala to merge them. In the manual, the columns M/ISYM and
> BATCH  in mtz file are needed for running Scala. But I can not find or
> add these two columns in my data. The question is how can find these
> two columns in my data to run Scala or I should scale my data with
> other methods, and if there is any other programs can merge two sets
> of data into one? 
> Thank you.

For best results you should go back to HKL2000 (or SCALEPACK) to scale
the original integration output (*.x files) together. Scaling together
two already scaled sets will cause bias in weighting and rejection of
reflections.

-- 
=======================================================================
"He is an emissary of pity and science and progress, and devil knows
what else."- Heart of Darkness, Joseph Conrad
=======================================================================
                              David J. Schuller
                              modern man in a post-modern world
                              MacCHESS, Cornell University
                              [EMAIL PROTECTED]


Reply via email to