=======================================================================
SYNCHROTRON BEAMTIME FOR MACROMOLECULAR CRYSTALLOGRAPHY AT SLS
=======================================================================
Proposal application deadline: October 15, 2022 / midnight

IMPORTANT
This call for proposal covers the beamtime from Jan 2023 to Sep 2023, i.e., 9 
months rather than 6, and is the last call for proposals before the upgrade of 
the SLS. The upgrade shutdown is planned to start on Oct 2023. Pilot users at 
SLS 2.0 are expected in the Summer/Fall of 2025, and the first regular call for 
proposal is planned for the Spring 2026.

Periods
Jan 1, 2023 - September 30, 2023 (start of the SLS 2.0 upgrade)

Proposal submission
http://www.psi.ch/sls/px-beamlines-call-for-proposals
Latest news
Proposals to be submitted to X06SA-PXI only.

Multi-axis goniometer SmarGon installed.
Unattended data collection available all the time 
(https://www.psi.ch/en/sls/pxi/mx-software-documentation)
Remote operation for conventional cryogenic data collection (with Unipucks and 
SPINE sample holders)
Please contact us for experiments requiring on-site presence, e.g. 
room-temperature crystallography, serial crystallography with injector.
European academic users can claim dewar shipping costs.

Please visit http://www.psi.ch/sls/pxi (X06SA-PXI) for more information about 
the beamline.

Best regards,

The MX group at SLS



########################################################################

To unsubscribe from the CCP4BB list, click the following link:
https://www.jiscmail.ac.uk/cgi-bin/WA-JISC.exe?SUBED1=CCP4BB&A=1

This message was issued to members of www.jiscmail.ac.uk/CCP4BB, a mailing list 
hosted by www.jiscmail.ac.uk, terms & conditions are available at 
https://www.jiscmail.ac.uk/policyandsecurity/

Reply via email to