In the early 70s I worked at a place that had 2 S360/40s. On the 23rd floor of 
a 45+ year old building.  At least 8 tape drives, 2 control units for them, 2 
full banks of 2314, 2 1403 printers and 2 2540 card machines. 

I would assume updated wiring would have to have been run up 23 floors. When I 
started there was 1 S360/30. Don’t know if the normal building wiring would 
need to be updated for that.

Reply via email to