On Wed, Jun 10, 2015 at 9:38 AM, Jim Biard <[email protected]> wrote:
> I think that CF conventions sections about the calendar attribute should > say something along the lines of: > > 4.4.1 Calendar > In order to know what point in history has been measured by a given base > date, base time, and time increment, one must know what calendar was used > for the base date and time. The calendar attribute defines the particular > date and time system that was used to express the reference time string > found in the units attribute, and is assigned to the time coordinate > variable. The values currently defined for calendar are: > ... > > looks good to me. -Chris -- Christopher Barker, Ph.D. Oceanographer Emergency Response Division NOAA/NOS/OR&R (206) 526-6959 voice 7600 Sand Point Way NE (206) 526-6329 fax Seattle, WA 98115 (206) 526-6317 main reception [email protected]
_______________________________________________ CF-metadata mailing list [email protected] http://mailman.cgd.ucar.edu/mailman/listinfo/cf-metadata
