I've got about 20 scheduled tasks set up in a CF9 installation, and I have 
every single one of them PAUSED. Yes, the second icon from the left in the 
"Actions" column of the Scheduled Tasks page in CF Admin shows as a "green 
light" document, with the title (tool tip) of "Resume Scheduled Task" for every 
task. These tasks are definitely PAUSED. Yet the "Last Run" is continually 
updating with a new date/time at every interval specified by the task settings. 
Now, I have most of these tasks set up to save output to a file, and those 
files are not being created, so that leads me to believe that these tasks are 
indeed NOT running, contrary to what the date/times in the "Last Run" column is 
telling me. Is this a known bug? 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|
Order the Adobe Coldfusion Anthology now!
http://www.amazon.com/Adobe-Coldfusion-Anthology-Michael-Dinowitz/dp/1430272155/?tag=houseoffusion
Archive: 
http://www.houseoffusion.com/groups/cf-talk/message.cfm/messageid:337867
Subscription: http://www.houseoffusion.com/groups/cf-talk/subscribe.cfm
Unsubscribe: http://www.houseoffusion.com/groups/cf-talk/unsubscribe.cfm

Reply via email to