I just want to ditto everything Ted just said, except that I'm
running Chandler release 0.7 Alpha2 on my 12" G4 laptop. ;)
-Priscilla
On Jun 8, 2006, at 5:48 PM, Ted Leung wrote:
I do all of these things on a regular basis. I have 5 calendars in
my sidebar and I definitely switch between them. Sometimes I need
to add an event to the office calendar, other times to my personal
work calendar. I am switching calendars a lot.
With 5 calendars in the sidebar, The screen is often over full
with events -- even though I am running on large (1920 x 1440)
monitor with an enlarged Chandler window -- so I am often
activating and deactivating calendars using the checkboxes.
I also change the view regularly because the meetings are a week or
two ahead of today's date.
In short, all three of these situations happen regularly for me.
And they happen after I rerun Chandler, and they happen the second,
third, and 10th time that I do them.
Additionally, double clicking to create an event is very slow, and
I frequently find that I have created two events because I thought
that the mouse didn't click or something like that.
I also find the the performance of syncinng (no surprise) is a
usability barrier.
This is all from my experience with the Intel Mac build.
Ted
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Open Source Applications Foundation "chandler-dev" mailing list
http://lists.osafoundation.org/mailman/listinfo/chandler-dev