[ 
https://issues.apache.org/jira/browse/CHUKWA-155?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Cheng reassigned CHUKWA-155:
----------------------------

    Assignee: Cheng  (was: Jerome Boulon)

> Job History status arrive out of order causing the status to update 
> incorrectly.
> --------------------------------------------------------------------------------
>
>                 Key: CHUKWA-155
>                 URL: https://issues.apache.org/jira/browse/CHUKWA-155
>             Project: Hadoop Chukwa
>          Issue Type: Bug
>          Components: data collection, Data Processors
>         Environment: Redhat 5.1, Java 6
>            Reporter: Eric Yang
>            Assignee: Cheng
>            Priority: Critical
>         Attachments: chukwa-155.patch
>
>
> Job history contains lines like:
> Job JOBID="job_200903310541_1747" JOB_STATUS="RUNNING" .
> ...
> Job JOBID="job_200903310541_1747" FINISH_TIME="1238542231308" 
> JOB_STATUS="SUCCESS" FINISHED_MAPS="1338" FINISHED_REDUCES="760" 
> FAILED_MAPS="78" FAILED_REDUCES="43" COUNTERS="..." .
> When pushing the data through collectors and demux, the data can arrive out 
> of order.  The database is updated with status "RUNNING" instead of 
> "SUCCESS".  
> Chukwa Sequence ID can be used to sort out of order data before the data is 
> pumped to database.

-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.

Reply via email to