http://bugs.cinelerra.org/show_bug.cgi?id=359
Summary: changing video rate of project changes clip in and out
points
Product: Cinelerra
Version: 2.1
Platform: PC
OS/Version: Linux
Status: NEW
Severity: normal
Priority: Medium
Component: File Loading
AssignedTo: [email protected]
ReportedBy: [EMAIL PROTECTED]
I started a project accidentally with a 5 fps video frame rate (I believe
Cinelerra's project frame rate defaults to the last project's frame rate). I
began creating a lot of clips from my raw footage (NTSC DV in Quicktime). When
I was finished adding the clips, I dragged them to the timeline and did a test
render. That's when I discovered the wrong frame rate. I changed it to 29.97
(the same as the raw footage) in Settings->Format.
Now, however, my clips' in and out points are wrong. When I open them in the
Viewer, the original clips are not there.
If I change the settings back to the 5 fps rate, the clips return to their
original state. Should the clips, which I saw as "bookmarks" for the raw
footage, be affected like this by changing the project's frame rate? Note, it
didn't affect the assets in the Media Folder.
I did a diff of a simple 5fps xml and a 30fps file, it looks like Cinelerra is
not updating the STARTSOURCE and LENGTH values in the clips video track based on
the new frame rate.
thanks.
------- You are receiving this mail because: -------
You are the assignee for the bug, or are watching the assignee.
_______________________________________________
Cinelerra mailing list
[email protected]
https://init.linpro.no/mailman/skolelinux.no/listinfo/cinelerra