I don't really want to muddy the waters, but check the field notices on the
Cat6K's. There's a code issue with 5.3(2) and the gig ports, as well as several
issues with various 12.x versions of code for the MSFC's if you're using them.

I've already been bitten by those bugs, hope you can avoid them.

Joe Freeman, CCDA

Simon Watson wrote:

> Hi Guys
>
> I have a catalyst 6509 with 2 * Gigabit ethernet ports on the supervisor
> module(module1) & 3 further modules with 8 * Gigabit ethernet ports on each
> module(modules 2,3 & 4).
>
> I initially wanted to set up a Gigabit Etherchannel with one of the ports on
> the supervisor module  with one of the Gigabit Ethernet ports on module 4.
>
> However I'm sure that I remember reading somewhere that you can only set up
> etherchannels with ports that are grouped together, which would mean that I
> cannot adopt what I have mentioned above.
>
> Can someone please confirm this
>
> Many Thanks
>
> Simon
> ________________________________________________________________________
> Get Your Private, Free E-mail from MSN Hotmail at http://www.hotmail.com
>
> ___________________________________
> UPDATED Posting Guidelines: http://www.groupstudy.com/list/guide.html
> FAQ, list archives, and subscription info: http://www.groupstudy.com
> Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]
> ---

___________________________________
UPDATED Posting Guidelines: http://www.groupstudy.com/list/guide.html
FAQ, list archives, and subscription info: http://www.groupstudy.com
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]

Reply via email to