In the context of a Frame Relay switch there are two uses of DCE. On the
physical layer DCE refers to the end that requires clocking. On the layer
two or Frame Relay area of the config the FR Switch needs to be identified
as acting as DCE equipment. So a router acting as a Frame Relay Switch can
use either DTE or DCE cables. It must identify itself as DCE as Ejay gave
before "frame-relay intf-type dce"
Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=13147&t=13133
--------------------------------------------------
FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]