guys,

another question ..

in on of my sites i have clusters of 3548 switches ..
At each end of the cluster i have a link to the distribution layer...
i have multiple uplink to each switch (6 in cluster)..
and in the middle we have set the spanning-tree cost on one interface of the 
uplinks to much higher than default ...(that way switch 1 -3 use 
distribution link 1 and switch 4-6 use distribution link 6 )..what i am 
finding odd is that on switches 3 and 4 (the middle of my cluster) i have to 
increase the cost on both switches`uplinks sometimes
and others just 1 switch, other times.(to force it into blocking)...

floor 1 i had to do both
floor 2 just switch 3
floor 4 both
floor 5 just switch 3
floor 6 just switch 3

what i dont understand is why...???

i should have to set the uplink ports from 3 to 4 to
both having high costs ...

why does it sometimes work with just one...

any idea`s..

_________________________________________________________________
Get your FREE download of MSN Explorer at http://explorer.msn.com/intl.asp.




Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=37663&t=37663
--------------------------------------------------
FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]

Reply via email to