It was a short week and I spent more than a half day on my dental 
appointment, so that I was not as productive as I expected:

* Clearview items for the this week
** Went through the ESR UV page and sent the comments to Seb.
** Roch agreed to provide more information about the performance testing 
this week.
** Discussed with Dan and we agreed to to make his link management low level 
design as part of the UV design document.
** Updating the UV document (80% done)
** Discussed the correct processing of a physical link removal during system 
shutdown.
** Discussed the per-driver/per-link/default network device policy in 
network-discuss alias. So far, the replies indicate the default policy might 
be sufficient and we should introduce the per-link policy in the future.
** Discussed dlpi_open() fallback logic because the current 
fallback-after-ENOENT-failure cannot handle all cases.
** Went through the UV inception issues and (I think) addressed all of them.
** Fixed several bugs found during EA testing and UV testing:
*** show-linkprop prompts warning when the link is deleted temporarily
up-aggr fails
*** Bug 6555423, and Dan verified the fix.
*** data-link configuration needs to be restored when renaming a (just) 
connected physical link to a disconnected link.
*** Several bugs in the rename-link processing.

* Clearview items for next week
** Finish updating the UV document
** fixing bugs found in the UV code
** Discuss with the WPA team and nwam team about the interaction of their 
project and libdladm and start to work on the changes.

* Bugs
** Root caused 6553243 and closed it as a duplicate of 6534183.
** Root caused 6556934 and put myself as the RE.
** No response for 6438988 from the submitter yet. Just sent a reminder mail.
** Took bug 6553243.

* Potential trip
** I will probably go to MPK on June for about 10 days, and might need to 
take several days off during that time.

Thanks
- Cathy