[
https://issues.apache.org/jira/browse/CLEREZZA-564?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Daniel Spicar resolved CLEREZZA-564.
------------------------------------
Resolution: Fixed
Fix Version/s: 0.2-incubating
While not all suggestions in the discussion are implemented (e.g. a Scheduling
Service), the basic Improvement specified by this issue has been implemented.
Therefore I am resolving this issue.
> CRIS: call optimize in an extra thread
> --------------------------------------
>
> Key: CLEREZZA-564
> URL: https://issues.apache.org/jira/browse/CLEREZZA-564
> Project: Clerezza
> Issue Type: Improvement
> Affects Versions: 0.2-incubating
> Reporter: Tsuyoshi Ito
> Assignee: Daniel Spicar
> Fix For: 0.2-incubating
>
> Attachments: ZZ-564-rdf.cris.core-optimize-20110715-patch.diff
>
>
> Comment from Tommaso (see
> http://mail-archives.apache.org/mod_mbox/incubator-clerezza-dev/201106.mbox/%[email protected]%3E)
> A possible enhancement could be to create an OptimizeThread with a
> timeInterval constructor which optimizes the index, if there is not "much"
> activity (i.e.: analyze isLocked, InfoStream, etc), every timeInterval
> seconds.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators:
https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira