Rob van der Heij <[email protected]> wrote :-

>> columns 78-81 being one of 3 values - but this would be easy in a
separate

> | l: lookup 78.3 1.3 detail ..

> \ literal CGA RMH IBM | split | l:

Yes - that was the easy bit. That is one of at least 3 different ways I
can think of doing it. I only mentioned it in case I was being obtuse and
it could easily be incorporated into one stage with the other check. (I
know I am often obtuse - but lets gloss over that).


Colin Allinson
Amadeus Data Processing GmbH

Reply via email to