I am about to reinstall the clutches and handrails on my 30-2. The PO had told me that C&C made some areas of the deck uncored where factory equipment was installed with through-bolts. I can hear a difference when tapping on the area that the clutches are installed in, so I am guessing that is uncored. I am not as sure about the handrail attachment points. Wondering if I need to overdrill and fill these holes to be safe. Any of you 30-2 owners investigated this?
Thanks, Jim Reinardy C&C 30-2 "Firewater" Milwaukee, WI
_______________________________________________ This list is supported by the generous donations of our members. If you wish to make a contribution to offset our costs, please go to: https://www.paypal.me/stumurray All Contributions are greatly appreciated!