Ok, due to high demand, here is again the proposed Release Plan:

Hi Team,

now that some weeks have passed since our last release (the beta 2),
we should plan our next steps for getting final with cocoon 2.

Looking through the postings on the dev and user list over the last
weeks, I think we can be very proud of the current state of cocoon 2.
Of course there is enough space for improvements etc.

Now that more and more people are getting used to cocoon 2, we get
more and more suggestions for making it better (and bigger). This
is really great and this is exactly what we need to keep on the
development of such a great open source project.
But I think, before we go on and change cocoon 2 here and there,
we should make a final release of 2.0 first.
We could then start with 2.1 and make the necessary changes (this
was one of the reasons why we currently maintain the two branches).

Why a final release first? Many people (and companies) are waiting
for a long time to get c2. Most of them are scared of beta releases.
So if we make a final release we attract even more people and I
believe (or fear?) that the response might be overhelming us. They
can benefit from a final, offical release and we can benefit from
the reaction.

So here is my suggestion:
- Making another beta which should include the points mentioned below
- Looking for a time (about four weeks) if everything is stable,
  fixing last bugs and making the final release (However, if the next
  beta is unstable, we must make another beta after the period of time
  and start with this point over and over again).

What do we need for the next beta?
- Incorporate all outstanding patches and bugfixes (Dims has already
  requested for this).
- Fix all outstanding bugs
- Decide which parts of C2.1 should go into 2.0
- Update documentation. This point needs the most work, I think. The
  documentation is currently a bit crowded. For example we have the
  Sitemap documentation which explains all sitemap components, but
  for matchers, selectors and actions there are different documents.
  This should be unified and we should split the documentation into
  user and developer documentation. The user docs mainly for installing,
  configuring and using c2 by creating own pipelines and using the
  existing components.
  The developer doc should contain everything needed for building
  own components.
- Final versions of the other projects used by c2, mainly these
  are Avalon Excalibur, Avalon LogKit and Xalan. Perhaps we must also
  update to a newer FOP version.
- Layout the distribution: What files in which format should really
  get into the distribution. As everybody has the recompile the dist
  to get the examples (in detail the sql examples) running, I think
  we shouldn't include a half binary dist. We should only distribute
  the sources, the required libraries, examples and (perhaps build)
  documentation.

I would propose to schedule the next (and hopefully final) beta for
the end of september, so we have the final release at the end of
October (the former ApacheCon Europe date....).

Thoughts? Comments? Suggestions?


Carsten

Open Source Group                        sunShine - b:Integrated
================================================================
Carsten Ziegeler, S&N AG, Klingenderstrasse 5, D-33100 Paderborn
www.sundn.de                          mailto: [EMAIL PROTECTED]
================================================================

> -----Ursprüngliche Nachricht-----
> Von: Morrison, John [mailto:[EMAIL PROTECTED]]
> Gesendet: Donnerstag, 16. August 2001 11:57
> An: '[EMAIL PROTECTED]'
> Betreff: RE: [C2] Release
>
>
> Would you mind terribly re-posting it?
>
> > -----Original Message-----
> > From: Carsten Ziegeler [mailto:[EMAIL PROTECTED]]
> > Sent: Thursday, 16 August 2001 10:32 am
> > To: [EMAIL PROTECTED]
> > Subject: AW: [C2] Release
> >
> >
> > Very good question! I am still waiting for a reply from anyone to
> > to my "Release Plans" email.
> >
> > Carsten
> >
> > > -----Ursprüngliche Nachricht-----
> > > Von: Morrison, John [mailto:[EMAIL PROTECTED]]
> > > Gesendet: Donnerstag, 16. August 2001 11:27
> > > An: '[EMAIL PROTECTED]'
> > > Betreff: [C2] Release
> > >
> > >
> > > Hi all,
> > >
> > > Just wondering - what is remaining to let the 2.0 branch go final?
> > >
> > > J.
> > >
> > >
> > >
> > ==============================================================
> > =========
> > > Information in this email and any attachments are
> > confidential, and may
> > > not be copied or used by anyone other than the addressee,
> > nor disclosed
> > > to any third party without our permission.  There is no intention to
> > > create any legally binding contract or other commitment
> > through the use
> > > of this email.
> > >
> > > Experian Limited (registration number 653331).
> > > Registered office: Talbot House, Talbot Street, Nottingham NG1 5HF
> > >
> > >
> > ---------------------------------------------------------------------
> > > To unsubscribe, e-mail: [EMAIL PROTECTED]
> > > For additional commands, email: [EMAIL PROTECTED]
> > >
> >
> >
> > ---------------------------------------------------------------------
> > To unsubscribe, e-mail: [EMAIL PROTECTED]
> > For additional commands, email: [EMAIL PROTECTED]
> >
>
> ---------------------------------------------------------------------
> To unsubscribe, e-mail: [EMAIL PROTECTED]
> For additional commands, email: [EMAIL PROTECTED]
>


---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, email: [EMAIL PROTECTED]

Reply via email to