On Sat, Aug 4, 2012 at 4:44 AM, Dave Täht <[email protected]> wrote:
> From: Dave Taht <[email protected]>
>
> The consensus at ietf was that ecn marking should start at
> target, and then the results fed into the codel drop scheduler.
>
> While I agree with the latter, I feel that waiting an interval
> before starting to mark will be more in-tune with the concept
> of a sojourn time, and lead to better utilization.
>
> As I am outnumbered and outgunned, do it at target.

Well, what do you think is The Best way of doing it? Prove'em wrong if
you really think they are wrong;)



-- 

Roger Jorgensen           | ROJO9-RIPE
[email protected]          | - IPv6 is The Key!
http://www.jorgensen.no   | [email protected]
_______________________________________________
Codel mailing list
[email protected]
https://lists.bufferbloat.net/listinfo/codel

Reply via email to