[ 
https://issues.apache.org/jira/browse/ACE-433?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Wilfried Sibla updated ACE-433:
-------------------------------

    Attachment: AgentError.log

> New deployment needs two check cycles to download and to install a new DP
> -------------------------------------------------------------------------
>
>                 Key: ACE-433
>                 URL: https://issues.apache.org/jira/browse/ACE-433
>             Project: ACE
>          Issue Type: Bug
>          Components: Management Agent
>    Affects Versions: 1.0.0
>            Reporter: Wilfried Sibla
>            Priority: Critical
>         Attachments: AgentError.log
>
>
> I tested the new agent implementation but I observed a little bit curious 
> behavior:
> * At first check, the agent detects and downloads the update DP
> * Then it stops with log entry: [DEBUG] 21:50:31 (downloads) Download stopped 
> early: 926530 of -1 bytes downloaded... (0)
> * on the next check: [DEBUG] 21:50:39 (controller) Checking for deployment 
> updates..
> * new DP is detected: [DEBUG] 21:50:39 (controller) Need to install update: 
> newer deployment version available!
> * Download is resumed: [INFO] 21:50:39 (controller) Download of deployment 
> update is STOPPED. Resuming download...
> * and completed: [DEBUG] 21:51:00 (downloads) Download completed: 926530 
> bytes downloaded...
> This indicates that it needs to cycles to download and really install a DP.
> In DownloadCallableImpl.call():
> * is.getContentSize() return -1 during download
> * afterwards downloadComplete==false (line 100) and stoppedEarly==true (line 
> 101) indicates that the download seems to be stopped (DownloadState.STOPPED 
> in DownloadResult).
> Or is this behaviour (installing a downloaded DP during the next check cycle) 
> intended?



--
This message was sent by Atlassian JIRA
(v6.1#6144)

Reply via email to