https://issues.apache.org/jira/browse/AIRFLOW-4384?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Víctor Portals updated AIRFLOW-4384:
------------------------------------
    Description: 
I think it would be useful to include as DAG attribute a list of calendar 
events to be excluded from scheduling. I've came across with the need of 
excluding specific dates from scheduling, for example holidays, and I think it 
could be useful for maintenance windows too.

I've been doing some tests with a custom subclass of DAG. It would accept an 
attribute like

exclude_calendar = [\{ start_date: '2019-04-22T10:00:00.000+00:00 ', end_date: 
' 2019-04-22T11:00:00.000+00:00' }, \\{ start_date: 
'2019-04-22T17:00:00.000+00:00 ', end_date: ' 2019-04-22T18:00:00.000+00:00' }]

Then, when scheduler calls following_schedule function from DAG it would check 
if the following scheduled date belongs to any of the time windows included on 
exclude_calendar, and if it does, it will jump to the end of the time window, 
and check again, and so on until it finds a valid date.

Would be great if it could accept include_calendar too with the inverse 
behavior, only scheduling if it belongs to one of the time windows, but I think 
excluding will be enough for most use cases.

 

  was:
I think it would be useful to include as DAG attribute a list of calendar 
events to be excluded from scheduling. I've came across with the need of 
excluding specific dates from scheduling, for example holidays, and I think it 
could be useful for maintenance windows too.

I've been doing some tests with a custom subclass of DAG. It would accept an 
attribute like

```exclude_calendar = [\{ start_date: '2019-04-22T10:00:00.000+00:00 ', 
end_date: ' 2019-04-22T11:00:00.000+00:00' }, \{ start_date: 
'2019-04-22T17:00:00.000+00:00 ', end_date: ' 2019-04-22T18:00:00.000+00:00' }] 
```

Then, when scheduler calls following_schedule function from DAG it would check 
if the following scheduled date belongs to any of the time windows included on 
exclude_calendar, and if it does, it will jump to the end of the time window, 
and check again, and so on until it finds a valid date.

Would be great if it could accept include_calendar too with the inverse 
behavior, only scheduling if it belongs to one of the time windows, but I think 
excluding will be enough for most use cases.

 


> Support exclude from scheduling time windows
> --------------------------------------------
>
>                 Key: AIRFLOW-4384
>                 URL: https://issues.apache.org/jira/browse/AIRFLOW-4384
>             Project: Apache Airflow
>          Issue Type: Improvement
>          Components: DAG, scheduler
>            Reporter: Víctor Portals
>            Priority: Minor
>              Labels: calendar, features, scheduler
>
> I think it would be useful to include as DAG attribute a list of calendar 
> events to be excluded from scheduling. I've came across with the need of 
> excluding specific dates from scheduling, for example holidays, and I think 
> it could be useful for maintenance windows too.
> I've been doing some tests with a custom subclass of DAG. It would accept an 
> attribute like
> exclude_calendar = [\{ start_date: '2019-04-22T10:00:00.000+00:00 ', 
> end_date: ' 2019-04-22T11:00:00.000+00:00' }, \\{ start_date: 
> '2019-04-22T17:00:00.000+00:00 ', end_date: ' 2019-04-22T18:00:00.000+00:00' 
> }]
> Then, when scheduler calls following_schedule function from DAG it would 
> check if the following scheduled date belongs to any of the time windows 
> included on exclude_calendar, and if it does, it will jump to the end of the 
> time window, and check again, and so on until it finds a valid date.
> Would be great if it could accept include_calendar too with the inverse 
> behavior, only scheduling if it belongs to one of the time windows, but I 
> think excluding will be enough for most use cases.
>  



--