[ 
https://issues.apache.org/jira/browse/AIRFLOW-5037?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16892059#comment-16892059
 ] 

John Smodic commented on AIRFLOW-5037:
--------------------------------------

Ahh, thank you for the clarification [~jackjack10]. That is a bit confusing.

We almost exclusively use manually triggered DAGs and that date is 1:1 which is 
why we were confused.

 

Thanks!

> Execution Date is 24 hours behind
> ---------------------------------
>
>                 Key: AIRFLOW-5037
>                 URL: https://issues.apache.org/jira/browse/AIRFLOW-5037
>             Project: Apache Airflow
>          Issue Type: Bug
>          Components: webserver
>    Affects Versions: 1.10.2
>            Reporter: John Smodic
>            Priority: Minor
>         Attachments: Selection_999(022).png, airflow.png
>
>
> For a scheduled DAG that runs every day at "0 2 * * *", the execution date as 
> displayed is always behind.
>  
>   !Selection_999(022).png!
> !airflow.png!
> The tooltip doesn't seem to match (but it does for manually triggered DAGs), 
> and even then it's showing a date that's already passed. The DAG runs fine, 
> it just references the wrong date after the fact.
>  
> The config is set to UTC and this is deployed in aws on separate webserver / 
> scheduler nodes.



--
This message was sent by Atlassian JIRA
(v7.6.14#76016)

Reply via email to