This is an automated email from the ASF dual-hosted git repository.

jedcunningham pushed a commit to branch v2-9-test
in repository https://gitbox.apache.org/repos/asf/airflow.git

commit 1d40343286864942f32f4be6a7e3789790ea2fc2
Author: Ankit Chaurasia <[email protected]>
AuthorDate: Thu Mar 28 11:31:32 2024 +0545

    Fix typo with DatasetOrTimeSchedule as it was renamed (#38576)
    
    (cherry picked from commit 9a5974af48a8253d0e71bc2ab3179ee62371348b)
---
 docs/apache-airflow/authoring-and-scheduling/datasets.rst | 6 ++----
 1 file changed, 2 insertions(+), 4 deletions(-)

diff --git a/docs/apache-airflow/authoring-and-scheduling/datasets.rst 
b/docs/apache-airflow/authoring-and-scheduling/datasets.rst
index 354a69ff7e..1102420dd4 100644
--- a/docs/apache-airflow/authoring-and-scheduling/datasets.rst
+++ b/docs/apache-airflow/authoring-and-scheduling/datasets.rst
@@ -330,8 +330,6 @@ Combining Dataset and Time-Based Schedules
 
 DatasetTimetable Integration
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~
-With the introduction of ``DatasetTimetable``, it is now possible to schedule 
DAGs based on both dataset events and time-based schedules. This feature offers 
flexibility for scenarios where a DAG needs to be triggered by data updates as 
well as run periodically according to a fixed timetable.
+With the introduction of ``DatasetOrTimeSchedule``, it is now possible to 
schedule DAGs based on both dataset events and time-based schedules. This 
feature offers flexibility for scenarios where a DAG needs to be triggered by 
data updates as well as run periodically according to a fixed timetable.
 
-For more detailed information on ``DatasetTimetable`` and its usage, refer to 
the corresponding section in :ref:`DatasetTimetable 
<dataset-timetable-section>`.
-
-These examples illustrate how Airflow's conditional dataset expressions can be 
used to create complex data-dependent scheduling scenarios, providing precise 
control over when DAGs are triggered in response to data updates.
+For more detailed information on ``DatasetOrTimeSchedule`` and its usage, 
refer to the corresponding section in :ref:`DatasetOrTimeSchedule 
<dataset-timetable-section>`.

Reply via email to