GitHub user Aneesh495 added a comment to the discussion: Runtime dynamic DAGs: letting each DagRun build its own graph
An integration test I’d like to see is two overlapping runs of the same DAG with different upstream edges for the same task ID. Have run A generate `prepare_a → train` and run B generate `prepare_b → train`. After B publishes its layout, clear `train` in A. The scheduler should still use A’s dependency edge, the worker should reconstruct A’s operator configuration, and the Grid view should still show A’s graph. That catches lookups keyed by DAG and task IDs that work until a newer run publishes a different layout. What should the existing [rerun with latest bundle version option](https://airflow.apache.org/docs/apache-airflow/stable/administration-and-deployment/dag-bundles.html#configuring-default-rerun-version-behavior) do for a runtime-generated layout? I’d keep the graph frozen and make it explicit whether the option can still change the bundle supplying the operator code. --- Drafted-by: Codex (GPT-6) (no human review before posting) GitHub link: https://github.com/apache/airflow/discussions/77421#discussioncomment-19786103 ---- This is an automatically sent email for [email protected]. To unsubscribe, please send an email to: [email protected]
