[
https://issues.apache.org/jira/browse/AIRFLOW-2352?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Slawomir Krysiak updated AIRFLOW-2352:
--------------------------------------
Description:
Hi,
It would be nice to be able to modify the period range (a.k.a start_date) per
dag/subdag and have scheduler pick it up. Not sure if that should be a feature
request or a bug, but I was under the assumption that it works that way
already. But for some reason it doesn't seem to be the case in 1.9.0 which I'm
using for my POC. Attaching my message from gitter.
Thanks,
Slawomir
was:
Hi,
It would be nice to be able to modify the period range (a.k.a start_date) per
dag/subdag and have scheduler pick it up. Not sure if that should be a feature
request or a bug, but I was under the assumption that it works that way
already. But for some reason it doesn't seem to be the case in 1.9.0 which I'm
using for my POC. Attaching my message from gitter.
Thanks,
Slawomir
> Airflow isn't picking up earlier periods after DAG definition update
> --------------------------------------------------------------------
>
> Key: AIRFLOW-2352
> URL: https://issues.apache.org/jira/browse/AIRFLOW-2352
> Project: Apache Airflow
> Issue Type: Bug
> Components: scheduler
> Affects Versions: 1.9.0
> Reporter: Slawomir Krysiak
> Assignee: Alex Lumpov
> Priority: Major
> Attachments: Screen Shot 2018-04-20 at 5.04.12 PM.png
>
>
> Hi,
>
> It would be nice to be able to modify the period range (a.k.a start_date) per
> dag/subdag and have scheduler pick it up. Not sure if that should be a
> feature request or a bug, but I was under the assumption that it works that
> way already. But for some reason it doesn't seem to be the case in 1.9.0
> which I'm using for my POC. Attaching my message from gitter.
> Thanks,
> Slawomir
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)