[
https://issues.apache.org/jira/browse/AIRFLOW-2673?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16522573#comment-16522573
]
Matthew Bowden commented on AIRFLOW-2673:
-----------------------------------------
Update on this ticket: it looks like a given date shows runs that occurred
_before_ that date. Does this behavior make sense? Would it be better if the
graph view showed runs _after_ the specified date?
> Tree view of manually triggered dags does not respect date
> ----------------------------------------------------------
>
> Key: AIRFLOW-2673
> URL: https://issues.apache.org/jira/browse/AIRFLOW-2673
> Project: Apache Airflow
> Issue Type: Bug
> Affects Versions: Airflow 2.0
> Reporter: Matthew Bowden
> Assignee: Matthew Bowden
> Priority: Minor
>
> Related to AIRFLOW-1853
> This is actually the same problem as the issue above, except instead of the
> number of runs it's the date specified. The page does not seem to respect the
> dates of manually triggered dags, perhaps because you need to know the exact
> date/time the DAG is triggered?
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)