Sébastien GENESTA created AIRFLOW-3267:
------------------------------------------
Summary: Airflow Scheduler instable after Webserver upgrade from
1.8 to 1.10
Key: AIRFLOW-3267
URL: https://issues.apache.org/jira/browse/AIRFLOW-3267
Project: Apache Airflow
Issue Type: Bug
Components: scheduler
Affects Versions: 1.10.0
Environment: Debian 8
Apache-Airflow 1.10
Reporter: Sébastien GENESTA
Hi,
We are encountering strange behaviour with Airflow Scheduler since our upgrade
from Apache Airflow 1.8 to 1.10.
We have configured 4 workers on 4 servers which all can treat 6 tasks
simultaneously.
We notice that after a period (not yet determined), the scheduler seems to stop
scheduling at is maximum capacity of this 24 tasks so delayed our process.
To troubleshoot this behaviour we've configured the scheduler reboot every 3
hours.
Thanks for your help.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)