Sébastien GENESTA created AIRFLOW-3267:
------------------------------------------

             Summary: Airflow Scheduler instable after Webserver upgrade from 
1.8 to 1.10
                 Key: AIRFLOW-3267
                 URL: https://issues.apache.org/jira/browse/AIRFLOW-3267
             Project: Apache Airflow
          Issue Type: Bug
          Components: scheduler
    Affects Versions: 1.10.0
         Environment: Debian 8
Apache-Airflow 1.10
            Reporter: Sébastien GENESTA


Hi,

We are encountering strange behaviour with Airflow Scheduler since our upgrade 
from Apache Airflow 1.8 to 1.10.

We have configured 4 workers on 4 servers which all can treat 6 tasks 
simultaneously.

We notice that after a period (not yet determined), the scheduler seems to stop 
scheduling at is maximum capacity of this 24 tasks so delayed our process.

To troubleshoot this behaviour we've configured the scheduler reboot every 3 
hours.

Thanks for your help.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to