[ 
https://issues.apache.org/jira/browse/BEAM-1550?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15883980#comment-15883980
 ] 

Kenneth Knowles commented on BEAM-1550:
---------------------------------------

At first, I thought it was a nondeterministic failure that would be hard to 
reproduce, but when I looked at the Jenkins history, it was every single build. 
It also hung on my machine when I was running my "verify then push" script to 
merge someone's PR. So hopefully it won't be too hard.

> HBaseIO tests timeout precommit
> -------------------------------
>
>                 Key: BEAM-1550
>                 URL: https://issues.apache.org/jira/browse/BEAM-1550
>             Project: Beam
>          Issue Type: Bug
>          Components: sdk-java-extensions
>            Reporter: Kenneth Knowles
>            Assignee: Kenneth Knowles
>            Priority: Blocker
>
> Since build 7819 of the Jenkins precommit, the HBaseIOTest 
> (beam-sdks-java-io-hbase) has been timing out:
> https://builds.apache.org/view/Beam/job/beam_PreCommit_Java_MavenInstall/7819/console



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

Reply via email to