[
https://issues.apache.org/jira/browse/BEAM-1550?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15883980#comment-15883980
]
Kenneth Knowles commented on BEAM-1550:
---------------------------------------
At first, I thought it was a nondeterministic failure that would be hard to
reproduce, but when I looked at the Jenkins history, it was every single build.
It also hung on my machine when I was running my "verify then push" script to
merge someone's PR. So hopefully it won't be too hard.
> HBaseIO tests timeout precommit
> -------------------------------
>
> Key: BEAM-1550
> URL: https://issues.apache.org/jira/browse/BEAM-1550
> Project: Beam
> Issue Type: Bug
> Components: sdk-java-extensions
> Reporter: Kenneth Knowles
> Assignee: Kenneth Knowles
> Priority: Blocker
>
> Since build 7819 of the Jenkins precommit, the HBaseIOTest
> (beam-sdks-java-io-hbase) has been timing out:
> https://builds.apache.org/view/Beam/job/beam_PreCommit_Java_MavenInstall/7819/console
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)