[
https://issues.apache.org/jira/browse/BEAM-3056?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Valentyn Tymofieiev reassigned BEAM-3056:
-----------------------------------------
Assignee: Reuven Lax (was: Jason Kuster)
> dataflow-runner-integration-tests @ beam-examples-java fail in precommit
> suite on 2.2.0 branch
> -----------------------------------------------------------------------------------------------
>
> Key: BEAM-3056
> URL: https://issues.apache.org/jira/browse/BEAM-3056
> Project: Beam
> Issue Type: Bug
> Components: testing
> Affects Versions: 2.2.0
> Reporter: Valentyn Tymofieiev
> Assignee: Reuven Lax
> Priority: Blocker
>
> Here's an example of two instances where the issue affected me in the last
> few days.
> The test suite consistently made progress, then timed out after 150 min.
> https://builds.apache.org/job/beam_PreCommit_Java_MavenInstall/15044/consoleFull
> https://builds.apache.org/job/beam_PreCommit_Java_MavenInstall/15037/consoleFull
> What are our options here, besides increasing the timeout?
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)