[ 
https://issues.apache.org/jira/browse/BEAM-3056?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Valentyn Tymofieiev reassigned BEAM-3056:
-----------------------------------------

    Assignee: Reuven Lax  (was: Jason Kuster)

> dataflow-runner-integration-tests @ beam-examples-java  fail in precommit 
> suite on 2.2.0 branch
> -----------------------------------------------------------------------------------------------
>
>                 Key: BEAM-3056
>                 URL: https://issues.apache.org/jira/browse/BEAM-3056
>             Project: Beam
>          Issue Type: Bug
>          Components: testing
>    Affects Versions: 2.2.0
>            Reporter: Valentyn Tymofieiev
>            Assignee: Reuven Lax
>            Priority: Blocker
>
> Here's an example of two instances where the issue affected me in the last 
> few days.
> The test suite consistently made progress, then timed out after 150 min.
> https://builds.apache.org/job/beam_PreCommit_Java_MavenInstall/15044/consoleFull
> https://builds.apache.org/job/beam_PreCommit_Java_MavenInstall/15037/consoleFull
> What are our options here, besides increasing the timeout?



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to