Alexey Romanenko created BEAM-3409:
--------------------------------------
Summary: Unexpected behavior of DoFn teardown method running in
unit tests
Key: BEAM-3409
URL: https://issues.apache.org/jira/browse/BEAM-3409
Project: Beam
Issue Type: Bug
Components: testing
Reporter: Alexey Romanenko
Assignee: Jason Kuster
Priority: Minor
Writing a unit test, I found out a strange behaviour of Teardown method of DoFn
implementation when I run this method in unit tests using TestPipeline.
To be more precise, it doesn’t wait until teardown() method will be finished,
it just exits from this method after about 1 sec (on my machine) even if it
should take longer (very simple example - running infinite loop inside this
method or put thread in sleep). In the same time, when I run the same code from
main() with ordinary Pipeline and direct runner, then it’s ok and it works as
expected - teardown() method will be performed completely despite how much time
it will take.
I created two test cases to reproduce this issue - the first one to run with
main() and the second one to run with junit. They use the same implementation
of DoFn (class LongTearDownFn) and expects that teardown method will be running
at least for SLEEP_TIME ms. In case of running as junit test it's not a case
(see output log).
- run with main()
https://github.com/aromanenko-dev/beam-samples/blob/master/runners-tests/src/main/java/TearDown.java
- run with junit
https://github.com/aromanenko-dev/beam-samples/blob/master/runners-tests/src/test/java/TearDownTest.java
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)