[ 
https://issues.apache.org/jira/browse/BEAM-4016?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Ismaël Mejía updated BEAM-4016:
-------------------------------
    Attachment: sdf-splitrestriction-lifeycle-test.patch

> Direct runner incorrect lifecycle, @SplitRestriction should execute after 
> @Setup on SplittableDoFn
> --------------------------------------------------------------------------------------------------
>
>                 Key: BEAM-4016
>                 URL: https://issues.apache.org/jira/browse/BEAM-4016
>             Project: Beam
>          Issue Type: Bug
>          Components: runner-direct
>    Affects Versions: 2.4.0
>            Reporter: Ismaël Mejía
>            Assignee: Thomas Groh
>            Priority: Major
>         Attachments: sdf-splitrestriction-lifeycle-test.patch
>
>
> SplitRestriction is the method where we can split in advance a SDF. It makes 
> sense to execute this after the @Setup method given that usually connections 
> are established at Setup and can be used to ask the different data stores 
> about the partitioning strategy. I added a test for this in the 
> SplittableDoFnTest.SDFWithLifecycle test.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to