[
https://issues.apache.org/jira/browse/BEAM-4053?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Alan Myrvold resolved BEAM-4053.
--------------------------------
Resolution: Fixed
Fix Version/s: 2.5.0
> Go should have a postcommit run on a cron schedule
> --------------------------------------------------
>
> Key: BEAM-4053
> URL: https://issues.apache.org/jira/browse/BEAM-4053
> Project: Beam
> Issue Type: New Feature
> Components: build-system
> Reporter: Alan Myrvold
> Assignee: Alan Myrvold
> Priority: Major
> Fix For: 2.5.0
>
> Time Spent: 1h 40m
> Remaining Estimate: 0h
>
> To allow assessing if it is reliable, there should be a Go postcommit,
> initially the same as the precommit.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)